Thursday, September 12, 2013

Progress with ongoing tasks

The wiring harness is now connected to all dash instruments and switches.  The engine bay is nearly complete, only the brake lights, heater fan and windshield wiper motor left to connect.

Dash instruments in place.
The trunk carpet and liner are in place, though the liner is only in for test fitting.  There are some sound proofing bits still to go in and the rear seat will be put in before the trunk is buttoned up.

Trunk liner and carpet.  The side parts of the liner still need to be made, as does the spare tire well carpet.


The carpet preparation and carpet fitting is well started, I have been gluing the permanent pieces in with the 3M 8088 spray on contact cement.  It has worked well in other projects.

Transmission tunnel and cross member carpets in place.

Loose carpet pieces cut and test fitted.